GMP Lab Buildout
Client: Sorrento Therapeutics

Overview
This project was a two-phase renovation project that involved building new labs and converting existing labs into new, expanded facilities.

Align Builders constructed an ISO8/ISO7 clean room suite for Sorrento Therapeutics in 2015/2016. The work was produced per plan with close coordination between architect and Sorrento. Sorrento has been quite satisfied with the clean room suite’s performance. It was a pleasure to work with the Align team.
By Troy W. Gardner – Vice President, Facilities; Sorrento Therapeutics, Inc.